St. Michael’s HOR

St. Michael’s Head of the River
Date: 23/03/2013
Duration: 1 day
Venue: Limerick
Cost: N/A

Due to the high water volumes on the Shannon Navigation, the ESB are unable to close the gates at Parteen weir above O’Briensbridge, As a result St Michael’s consider that the river is not safe to run a Head. The event will run on the 23rd of March instead. DUBCs participation in this event is unlikely because of the change of date.